Energy Audit at Vietnam-Ninh Binh Kyoei Steel Company

Energy Auditor Team includes:

Bui Thanh Hung, Energy Auditor Team-leader

Tran Huy Cap, Team member

Do Manh Hung, Team member

Ha Quang Thinh, Team member

Cooperate with technical staff from Vietnam Kyoei Steel Co, Ltd.

Image: Steel Furnace Survey

Energy Audit results illustrated energy saving opportunities and energy efficiency solutions implementation plan as below:

1.Strengthening inner-management and equipment maintenance are important. Implementing those activities often cost little or very small but effectively for energy saving. This is priority because it has decisive and significant impact to the application of energy saving solutions. The implementation scope: the whole company.

-Some inner management activities and maintenance should be strengthened note as follow:

-Checking the whole energy supplying system periodically to evaluate the current state of operation then brought out maintenance plan in order to improve usage efficiency of energy consumption instruments.

-Cleaning energy usage instruments frequently: power drivers and lights.

-Enhance maintenance for air-conditional system in the operation and office area.

-Turn off devices, lights, fans and unnecessary auxiliary power when go out.

-Limit the use of high capacity devices in the rush hours.

-Develop operating procedure to minimize idling equipments or running at low load

-Set up an instrument operation effectively plan to meet production standard.

-Avoid abusing compressed air

-Establish Energy Management System: can based on ISO50001 or Total Energy Management System (TEM)

2.“Install Air Redundancy Controlling System for heating furnace” Solution brings high efficiency, low investment cost and short pay-back period.

3.“Install Auto Controlling System for cooling tower” Solution.

4.“Install Inverters for Cranes” Solution. The company may implement in sequence, unnecessarily conducted simultaneously. The company should priority install inverters for cranes which work much more time first, result in high energy saving efficiency.


Authority: ECCBACHKHOA Company

BACH KHOA ENERGY CONSERVATION JOINT STOCK COMPANY

Head office: No. 27, Alley 262B, Nguyen Trai Street, Thanh Xuan Trung Ward, Thanh Xuan District, Hanoi

Phone: (84.4) 3623.1704

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Website: www.eccbachkhoa.vn

SEO Solutions - Energy Audit - ECCBACHKHOA Energy Audit